chore(deps-dev): bump the python group across 1 directory with 10 updates #9294
tidy3d-python-client-tests.yml
on: pull_request
determine-test-scope
2s
Matrix: extras-integration-tests / integration-tests-basic
Waiting for pending jobs
Matrix: extras-integration-tests / integration-tests-full
Waiting for pending jobs
Matrix: local-tests
Matrix: remote-tests
verify-version-consistency
test-submodules
develop-cli-tests
/
test-dev-commands
pr-requirements-pass
4s
Annotations
4 errors
|
python-3.13-self-hosted-runner
Process completed with exit code 1.
|
|
python-3.10-self-hosted-runner
The strategy configuration was canceled because "local-tests._3_13" failed
|
|
workflow-validation
Process completed with exit code 1.
|
|
pr-requirements-pass
Process completed with exit code 1.
|